Coasters
Hardboard coaster with cork back
JPPlus / product guidance
Temperature385°F196–196°C
Time1 min–1 min 10 sec
Pressureheavy
Verify before production. This result assumes the cited product scope. Test with the actual press, transfer system, blank lot, environment, and production conditions.
Preparation
- Remove protective film when present.
- Clean the imaging face and secure the transfer.
Removal and cooling
- Paper removal
- Remove the transfer immediately using heat gloves.
- Cooling
- Cool flat.
Scope and caveats
- The illustrated JPPlus workflow notes that settings may vary by equipment.
Evidence
Sources
- Johnson Plastics Plus — How to Sublimate a Hardboard Coaster with Cork BackOfficial source · last checked 2026-08-04