← Settings finder

Coasters

Hardboard coaster with cork back

JPPlus / product guidance

Supplier guidance
Temperature385°F196196°C
Time1 min–1 min 10 sec
Pressureheavy
Verify before production. This result assumes the cited product scope. Test with the actual press, transfer system, blank lot, environment, and production conditions.

Preparation

  1. Remove protective film when present.
  2. Clean the imaging face and secure the transfer.

Removal and cooling

Paper removal
Remove the transfer immediately using heat gloves.
Cooling
Cool flat.

Scope and caveats

  • The illustrated JPPlus workflow notes that settings may vary by equipment.

Evidence

Sources

  1. Johnson Plastics PlusHow to Sublimate a Hardboard Coaster with Cork BackOfficial source · last checked 2026-08-04